Cubbie Renewable Energy
Cubbie Ag is in the process of developing a solar project for the generation of renewable energy for its own consumption at the ginnery.
Ultimately Cubbie Ag wishes to provide power to the towns of Dirranbandi and St George.
Design and construction will commence during the second half of 2018 with a view to be commissioning the generator late 2018.
Stage 1 of the project consists of constructing a 3.5MWDC Solar Farm Non-export generation which involves mounting some 9,800 solar panels onto fixed structure and wired through to the inverter.